news

Runway rehabilitation at Toulouse-Blagnac airport

Posted: 3 May 2012 | Egis Avia | 1 comment

Egis is in charge of repairing around 3000m of the 14L-32R main runway of Toulouse Airport…

Egis Avia Logo

Egis is in charge of repairing around 3000m of the 14L-32R main runway of Toulouse Airport, as well as the adjoining taxiways.

In addition to the pavement renovation, these works focus on creating drainage and sewage treatment systems, on rehabilitating existing networks, and on repairing the runway lightings. The works must be carried out before the test programme for the A350 certification run by Airbus (summer 2013).

Related organisations

Send this to a friend